A construction project is usually funded by several layers of money, each with a different claim on the project and a different price. Together they make up the capital stack. Understanding where each layer sits is the difference between a facility that works with your feasibility and one that quietly erodes it.
The capital stack
Think of the stack as a queue for repayment. When the project sells or refinances, the senior lender is repaid first, then any second or mezzanine lender, and the developer's equity last. The further down the queue, the more risk that money carries, and the more it costs.
Senior debt
Senior debt is secured by a first-ranking mortgage over the site and is repaid first. It is the cheapest money in the stack and usually the largest.
There are two broad sources. Bank senior debt is the lowest cost, but banks lend more conservatively, often require presales covering a substantial share of the debt, and look closely at the developer's track record. Private and non-bank senior debt typically allows higher leverage, fewer presales and faster credit decisions, in exchange for higher pricing.
Leverage is measured two ways: against the total development cost (loan to cost) and against the gross realisation value of the finished project (loan to GRV). Lenders apply whichever limit is reached first, so both numbers need to work.
Second mortgages
A second mortgage ranks behind the senior lender over the same security. It requires the senior lender's consent and a deed of priority, which sets out who is repaid first, how much each lender is entitled to, and what each can do if the loan goes into default.
Not every senior lender will allow a second mortgage. If you expect to need one, confirm that before you accept the senior term sheet, not after.
Mezzanine finance
Mezzanine finance fills the gap between the senior debt and the developer's equity. It is usually secured by a second mortgage, sometimes supported by guarantees or other security, and is priced well above senior debt because it carries more of the risk. Some mezzanine lenders charge a share of profit as well as interest.
A close relative is preferred equity, where an investor takes an equity position with a priority return instead of lending. The economics can be similar; the documentation and the rights on default are not.
Why use more than one layer
Adding mezzanine or second-ranking debt reduces the equity you need to put in. That can free capital for the next site and improve your return on equity. The trade-off is real: total finance costs rise, the development margin shrinks, there are more parties to manage, and covenants tighten. The question is not whether mezzanine is expensive, but whether the project still makes sense once it is priced in.
What to compare between offers
- The blended cost of the whole stack, not just the senior rate.
- All fees: establishment, line, exit and any profit share.
- Capitalised interest: whether it sits inside the facility limit, and whether your feasibility allows for it.
- Drawdown mechanics: quantity surveyor sign-off, retention and how long each draw takes.
- The deed of priority: default rights, step-in rights and standstill periods.
- Term and extensions, measured against a realistic build program rather than the best case.
How we approach it
We model the stack against your feasibility first, then approach senior and mezzanine lenders together so their terms are compatible from the start. The deed of priority is negotiated early, because it is the document most likely to hold up a settlement.